Контакт формо

7 Кызытсе вӱд пучым ыштымаште ППР-ын революций йӧнжӧ & Дренажный системе

Тӱнямбал чоҥымо отрасльыште шем трансформаций толкын эрта, Тӱнямбал вӱд ассоциаций дене ончыктен, мо марте 25% труба коррозийлан кӧра вӱд пуч системын йоммыжо. As a manufacturer of PPR piping for 15 years in the field of fluid transportation, we have been proven by 2000+ engineering casesusing ASTM certified PPR piping systems can reduce life cycle costs by 30%.

Part 1,Cкоррозий ваштареш шогышо ППР труба vs metal /PVC pipe

1. The king of corrosion resistance: chemical inertia to crack the industry pain points

Traditional galvanized steel pipe in pH<6.5 water quality, rust in 18 months, and PPR pipe through the ISO 9080 standard of 10,000 hours of chloride test, acid/alkali/salt tolerance increased 47 гана. A seawater desalination project in Dubai adopted our SDR11 specification PPR pipe, which has been running for 5 years without leakage.

2. Lightweight miracle: чоҥымо пашан пайдалыкше кугемын 300%

The weight of DN20 copper pipe per meter is 1.2kg, and the PPR pipe of the same specification is only 0.15kg. A high-rise apartment project in Malaysia estimated that the PPR system reduced the installation time from 28 days to 9 days, saving $15,000+ in labor costs.

Ужашыже 2,Hot melt connection technology: the ultimate solution to end the potential water leakage

Molecular level welding: the leakage rate is reduced to less than 0.03%

The use of 260±5℃ intelligent temperature control welding machine,can achieve molecular chain recombination welding. According to the EN ISO 10508 pressure test, the bursting pressure at the welding place reaches 6MPa, far exceeding the national standard 2.5MPa.

Operation guide:

1. Пӱчкедымаш: Use a special pipe cutter to ensure that the perpendicality of the section is less than 1°

2. Heating: strictly control the heating time according to the pipe diameter (DN20 pipe needs 5 секунд)

3. Docking: Insert without rotation and maintain cooling time (see welding parameter table below)

Pipe diameter (мм)Heating time (s)Cooling time (min)
2052
3284

Ужашыже 3, Тhe whole life cycle cost model: save in every 1 мм

50 year life promise: Maintenance costs drop 67%

The comparison of a hospital renovation project in Shanghai shows:

Оцинкованный полат труба: 10 years maintenance cost ¥380,000

PPR system: 10 years maintenance only ¥125,000

We offer 10 years quality insurance.

Ужашыже 4, Health and environmental protection dual certification

seize the green building track

Food grade safety: through the NSF/GB/T 17219 double certification

(Authoritative endorsement: PPR pipe non-toxic certification)

PPR raw materials comply with FDA 21 CFR 177.1520 standard, lead content <0.01мкг/л, especially suitable for maternal and child, hospitals/direct drinking water systems.

Ужашыже 5, 7 advantages of summary and engineering decision guide

 Contrast dimension PPR Pipeline Copper pipe PVC pipe
 Service life 50 курым +       15-20 курым 8-10 курым
 Combined cost ★☆☆☆☆ ☆(excellent)   ★★★☆ (medium)   ★★★★☆(poor)  
 Environmental index 100% перерабатыватлыме Partially recyclable Contains plasticizer

Advice for Project selection

Residential project: Preferred S5 series cold water pipe

Industrial piping system: The first choice is PN25 PPR Pipe high temperature (withstand 95℃ continuous hot water)

Рассылка уэмдымаш-влак

Тӱшкаште шке электрон почто адресдам пурто да мемнан рассылкылан подпискым ыштыза