Formola ta' Kuntatt

Gwida għall-Installazzjoni tal-Pipe PPR tad-Dar U Industrijali

Fil-mewġa globali ta 'titjib tas-sistema tal-provvista tal-ilma tal-bini, PPR (polipropilene kopolimeru każwali) pajpijiet are gradually replacing traditional metal pipes with their high temperature resistance, corrosion resistance and zero leakage characteristics. As a professional exporter who has been working in the pipeline industry for 10 snin, Let us reveals the PPR pipe standard installation process for you to help you create a reliable pipeline system with 50 years of maintenance free.

PPR Pipe Installation Guide

L-ewwel,Industrial and Home use PPR Pipeline Avantaġġi (Required reading before construction)

1. Material Ċkaratteristiċi

Operating temperature range: -20 ° C sa 95 ° C (better than the upper limit of 60 ° C of PVC pipe)

Compressive strength: 2.5MPa at 20℃ environment (through ISO 9001 ċertifikazzjoni)

Sanitary rating: NSF/ANSI 61 Drinking water system certification

2. Economic Ċomparison

Tip ta' pipelineInstallation costMaintenance cycleĦajja tas-servizz
Pajp tal-azzar galvanizzathigh3-5 snin15 snin
Copper pipeExtremely high8-10 snin25 snin
PPR tubeMediumMaintenance-free50 snin

Professional grade PPR tube installation 7-step method

Pass 1: Accurate mapping and cutting

Use a laser rangefinder to ensure ±2mm accuracy

Cutting tool selection:

Rotary cutter (DN20-DN63 pipe diameter)

Electric pipe cutter (DN75 + large diameter pipe)

Passi ta 'installazzjoni tal-pajp PPR

Pass 2: Key technologies of hot melt welding 

Temperature control: 260±5℃ (equipped with digital temperature control welding machine)

Heating time reference table:

Pipe diameter (mm)Heating time (s)Engaging time (s)Cooling time (min)
20542
32864
632486

Pass 3: Pipe fixing points

Pipe clamp spacing standard:

Horizontal pipe: DN20 pipe @600mm

Vertical tube: DN32 tube @1200mm

304 stainless steel spring clamps are recommended

5 Solutions to common installation problems 

1. Virtual welding problem diagnosis

Cause: pipe/fittings are not clean, insufficient heating time

Rapid detection method: 30° bending test after welding

2. Winter construction precautions

When the ambient temperature is < 5℃, the cooling time is extended by 50%

Use [brand name] low temperature special PPR tube (glass transition temperature -15℃)

3. Lintel sleeve installation specifications

Casing diameter ≥ pipe outer diameter +20mm

Fill with flexible flame retardant material for seal

4.Professional tool set recommended 

Intelligent temperature control welding machine: with temperature compensation function

Multifunctional pipe cutter: Support 20-110mm full specification

Pipe detector: can measure the depth of welding penetration

PPR pipe advantages

5.How to choose PPR pipeline? 

1. High quality raw materials

The Nordic chemical RA130E raw material is used, the ash content is < 0.02%

2. Global certification system

It has obtained 28 international certifications such as CE, WRAS and SGS

Fornitur

Luoyang Datang Energy Tech Co., Ltd. huwa manifattur Ċiniż ewlieni li jispeċjalizza f'pajpijiet u fittings tal-plastik ta 'kwalità għolja. Mgħammra b'linji ta 'produzzjoni awtomatizzati ta' l-aħħar u appoġġjati minn tim ta ' 200 professjonisti, noffru linja ta 'prodotti estensiva li tinkludi fuq 150 types of plastic pipes and fittings designed for water supply and drainage systems, trażmissjoni tal-gass, u sistemi tat-tisħin tal-art. prodotti ewlenin tagħna jinkludu Pajpijiet u Fittings tal-PVC, PE (HDPE) Pajpijiet u Fittings, Pajpijiet u Fittings PPR, u Pajpijiet tat-Tisħin tal-Art PEX. 

Jekk għandek xi mistoqsijiet dwar tagħna Pajpijiet u Fittings PPR b'saħħithom, jekk jogħġbok, toqgħodx lura milli tikkuntattjana!

Tel.:0086-183 3790 0677

Wechat: 0086-183 3790 0677

Whatsapp: 0086-183 3790 0677

Email: sales@pipesandfittings.net

Newsletter Aġġornamenti

Daħħal l-indirizz email tiegħek hawn taħt u abbona man-newsletter tagħna