Home And Industrial PPR Pipe Installation Guide

In the global wave of building water supply system upgrades, PPR (polypropylène copolymère aléatoire) tuyaux are gradually replacing traditional metal pipes with their high temperature resistance, corrosion resistance and zero leakage characteristics. As a professional exporter who has been working in the pipeline industry for 10 années, Let us reveals the PPR pipe standard installation process for you to help you create a reliable pipeline system with 50 years of maintenance free.

PPR Pipe Installation Guide

D'abord,Industrial and Home use PPR P.ipéline UNavantages (R.equired reading before construction)

1. Matériel Ccaractéristiques

Operating temperature range: -20 °C à 95 °C (better than the upper limit of 60 ° C of PVC pipe)

Résistance à la compression: 2.5MPa at 20℃ environment (through ISO 9001 certification)

Sanitary rating: NSF/ANSI 61 Drinking water system certification

2. Economic Ccomparaison

Type of pipelineInstallation costCycle d'entretienDurée de vie
Galvanized steel pipehigh3-5 années15 années
Tuyau en cuivreExtremely high8-10 années25 années
PPR tubeMediumSans entretien50 années

Professional grade PPR tube installation 7-step method

Step 1: Accurate mapping and cutting

Use a laser rangefinder to ensure ±2mm accuracy

Cutting tool selection:

Rotary cutter (DN20-DN63 pipe diameter)

Electric pipe cutter (DN75 + large diameter pipe)

PPR pipe installation steps

Step 2: Key technologies of hot melt welding 

Temperature control: 260±5℃ (equipped with digital temperature control welding machine)

Heating time reference table:

Pipe diameter (mm)Heating time (s)Engaging time (s)Temps de refroidissement (min)
20542
32864
632486

Step 3: Pipe fixing points

Pipe clamp spacing standard:

Horizontal pipe: DN20 pipe @600mm

Vertical tube: DN32 tube @1200mm

304 stainless steel spring clamps are recommended

5 Solutions to common installation problems 

1. Virtual welding problem diagnosis

Cause: pipe/fittings are not clean, insufficient heating time

Rapid detection method: 30° bending test after welding

2. Winter construction precautions

When the ambient temperature is < 5℃, the cooling time is extended by 50%

Utiliser [brand name] low temperature special PPR tube (glass transition temperature -15℃)

3. Lintel sleeve installation specifications

Casing diameter ≥ pipe outer diameter +20mm

Fill with flexible flame retardant material for seal

4.P.rofessional tool set recommended 

Intelligent temperature control welding machine: with temperature compensation function

Multifunctional pipe cutter: Support 20-110mm full specification

Pipe detector: can measure the depth of welding penetration

PPR pipe advantages

5.How to choose PPR pipeline? 

1. High quality raw materials

The Nordic chemical RA130E raw material is used, the ash content is < 0.02%

2. Global certification system

It has obtained 28 international certifications such as CE, WRAS and SGS

Fournisseur

Luoyang Datang Energy Tech Co., Ltée. est un fabricant chinois leader spécialisé dans les tuyaux et raccords en plastique de haute qualité. Equipé de lignes de production automatisées de pointe et soutenu par une équipe de 200 professionnels, nous proposons une vaste gamme de produits comprenant plus de 150 types of plastic pipes and fittings designed for water supply and drainage systems, transport de gaz, et systèmes de chauffage au sol. Nos principaux produits comprennent Tuyaux et raccords en PVC, PE (PEHD) Tuyaux et raccords, Tuyaux et raccords PPR, et tuyaux de chauffage au sol PEX. 

Si vous avez des questions concernant notre Tuyaux et raccords PPR sains, n'hésitez pas à nous contacter!

Tél.:0086-183 3790 0677

Wechat: 0086-183 3790 0677

WhatsApp: 0086-183 3790 0677

E-mail: sales@pipesandfittings.net

Mises à jour de la newsletter

Saisissez votre adresse e-mail ci-dessous et abonnez-vous à notre newsletter